Yadadari, Telangana, 2026
BHEL
Successfully executed 1.1 million m³ of earthwork, including extensive blasting and rock chiseling, completed 1,200 MT of structural steel erection with the integrated earth mat system, and delivered 40,000 m³ of Reinforced Cement Concrete (RCC) works. The project culminated in the successful delivery of a ₹260 Crore EPC project, achieved through unwavering commitment to quality, safety, engineering excellence, and on-time execution.